- By signing this contract, the client acknowledges and accepts the following terms and conditions, which complement the current estimate:
- I. Patio repairs exclusions: The present estimate does not include patio repairs due to any damage caused by machinery access to the pool.
- II. Modifications and required documents exclusions: We do not include the costs associated with alterations to the residence or the documents requested by local authorities, such as the septic tank report, survey, fumigation, or other documents. Additionally, the demolition process (Demucking) and the installation of sprinklers are not covered in this estimate.
- III. Owner’s responsibility: The owner will be responsible for removing or relocating the aforementioned items for pool access before construction begins, and this is not included in the current estimate. Our services are limited solely to pool construction and do not include repairs or improvements to the patio, child safety fence, or chemical treatment to stabilize the pool water.
- IV. Waiting time for permits: Please be advised that the waiting time to obtain city permits after the plans are submitted is beyond our responsibility and control. However, we will provide a process number for the client to track the progress of the application.
- V. Deadline for corrections or modifications: The assigned engineer will require an estimated period of 4 to 8 business days to address any corrections or modifications requested by municipal authorities regarding the plans.
- VI. Equipment Warranty: Our company offers a one-year warranty on equipment and structures, provided that the same owner remains during that year. If you wish to claim the pool structure warranty due to wear or discoloration, please note that we will verify that the maintenance responsible party holds the appropriate licenses.
- VII. Pool construction division: Bass Pool divides the pool construction into different sections. Each section will require the owner to provide the necessary capital to complete that specific section. In case of non-payment, the subsequent section will remain pending until the required payment is made.
- VIII. Project cancellation and non-refundable deposit: In the event that the project is not carried out for any reason, please note that the initial deposit made will not be refundable. This is due to the expenses incurred in preparing the plans, submitting permits, and other administrative costs associated with the office.